Links To Koi Industry East_Riding_Different_02.jpg (4104 bytes) East Riding Koi Co.  One of the UK's finest Koi sites. UK.gif (11944 bytes)  
 

 

 

 

 

Gold Label Aqua Pond Paint

 

 

 

 

 

 

Instructions for Gold Label Aqua Pond Paint

Before painting check your surfaces for imperfections, cracks etc and fill where appropriate.

For large cracks in the concrete, vee out the cracks to approx 10mm - make sure the surface to

be bonded is solid and dust free. Fill with Gold Label Pond & Aquarium Sealer. Painting can then

commence immediately. Although Aqua Pond Paint is much safer than normal resin systems, it is

recommended you should avoid contact by using barrier cream or gloves. Any splashes should

be washed off with soap and water.

Method of use

DO NOT apply in temperatures below 10C

Add the hardener in the top unit to the paint in the bottom unit and stir throughly, making sure it is completely mixed - VERY IMPORTANT - stir for a minimum of 2 minutes.

PLEASE NOTE - Once mixed, the paint is usable for 1.5 hours in ambient temperatures. Over 20c the working time will be reduced.

After mixing, apply immediately by brush, roller or spray. Ensure the coating is worked into the corners etc. Apply minimum of 2 coats. The second coat can be applied when the first is touch dry after approx 6-8 hours at 20c. The same for any subsequent coats.

The paint will cure hard in 12 hours and full cure in 3-7 days, depending on atmospheric conditions.  When fully cured, wash the painted surface and drain before final fill.

  • No primer needed

  • 2 coats only (on smooth surface)

  • Can be applied to damp surfaces

  • Water based, so less hazardous

  • Quicker pond refill

  • Easy tool cleanup

  • Packed in easy to mix bucket

  • Easy to apply with brush, roller or spray

  • 40sq.mtr / 5ltr coverage (on smooth surface)

   Frequently Asked Questions

Q] Do I need to use a primer first?
A] No - Aqua Pond Paint is self priming as long as the surface to be coated is sound

Q] Do I have to mix all of the paint and hardener at the same time?
A] No, you can split it into equal amounts and store the rest for later

Q] Do I need a dry surface to put the paint on?
A] No, as long as it is not raining and the air temperature is above
      10 degrees C and below 20 degrees C you can apply onto damp
        concrete the normal during times apply
     NB If rain is expected after application, protect for the initial cure time of 6-8 hours

Q] Do I need any special equipment to apply the paint?
A] No special equipment is needed - only a brush or roller or,
       if speed is required, a spray gun

Q] How quickly can I refill my pond?
A] Refill can start between 3 and 7 days, depending on the atmospheric
     conditions ie air temperature and moisture content

ONLY AVAILABLE IN BLACK AT THE MOMENT


SKU Description

Price

Order
GL-APP 1L 28.49 + Vat Order
GL-APP 2.5L 52.94 + Vat Order
GL-APP 5L 88.00 + Vat Order

 


Please be sure to look at the "P" Range...



We Are The Main UK Wholesalers for P1 Products
 Trade Enquiries Welcome

ERK Ltd
 

Please contact us if we can help in any matter <sales@koicarp.net>